Bishopgate, Coventry

PROJECT: In Progress

>> Bishopgate Coventry

CLIENT
Barberry
MAIN CONTRACTOR
Vinci construction Uk Ltd

EnviroSips have been awarded the Design, Engineering and Supply of 11,000M2 of EnviroSips backing wall system for the Bishopgate Student Accommodation Facility in Coventry. The system is mounted to the outside of a concrete frame structure which tower up to 17 storeys across three buildings. The external finish if the building will be an aluminium closed cassette system directly fixed to the EnviroSips backing wall.

The scheme is currently in progress with an anticipated completion to suit the 2018 Academic instake