Central Library & Digital Media Centre

PROJECT: Completed 2016

>> SOUTH SHEILDS, UK

CLIENT
SOUTH TYNESIDE COUNCIL
MAIN CONTRACTOR
Bowmer and Kirkland (North East and Scotland) Ltd

Envirosips were awarded the design, engineering, supply and delivery of over 2000M2 of EnviroSips structural insulated panel system.  This forms the high performance backing wall for the external finishes on the 3 storey concrete framed Central Library and Digital Media Centre. 

The system is mounted to the outside of the structure to provide unrivalled thermal and air leakage performance.